Truck Bed Coating Roll On Kit Black
(Pack of
2)
SKU:1710722 Item#: 1710722
Choice for recoating and restoring worn, unfinished or previously finished metal truck beds.
Abrasion and impact resistant
Durable, non-skid finish
Paint and primer in one
Protects against corrosion
1Gal Coating
Roller Frame
2 Roller Colors
Scuff Pad
Paint Brush
Roller Pan
Practical Coverage at Recommended DFT (Assumes 15% Material Loss): 140-160 sq ft/gal
Dry Times at 77°F (25°C) and 50% Relative Humidity - Touch: 2 hours
Dry Times at 77°F (25°C) and 50% Relative Humidity - Handle: 24-48 hours
Dry Times at 77°F (25°C) and 50% Relative Humidity - Recoat: 3 hours
Dry Times at 77°F (25°C) and 50% Relative Humidity - Full Cure: 5 days
Couldn't load pickup availability
California Proposition 65: WARNING: Cancer and Reproductive Harm -
www.P65Warnings.ca.gov
Frequently Bought Together
Foamy Orange Citrus Solvent Degreaser 18oz
Couldn't load pickup availability
Heavy Duty Red Grease 10.75oz
Couldn't load pickup availability
Clean Lube II PTFE Dry Lubricant 12.75oz
Couldn't load pickup availability
Outlast Heavy-Duty Rubberized Coating 16oz
Couldn't load pickup availability
High Solids Paints Omaha Orange
Couldn't load pickup availability
High Solids Paints Equipment Yellow
Couldn't load pickup availability
Truck Bed Coating Aerosol Flat Black 15 Ounce
Couldn't load pickup availability
Pro Grade Aerosol Truck Bed Coating Texture Sheen 15 Ounce
Couldn't load pickup availability
Auto Pro Undercoating Aerosol Black Rubber Sheen 15 Ounce
Couldn't load pickup availability
USS Flat Washer Thru-Hardened Steel 3/8"
Couldn't load pickup availability
SAE Flat Washer Thru-Hardened Steel 5/16"
Couldn't load pickup availability
Self-Drilling Screw Hex Head 1/4-14 x 1"
Couldn't load pickup availability
Product Description
Choice for recoating and restoring worn, unfinished or previously finished metal truck beds. Abrasion and impact resistant
Durable, non-skid finish
Paint and primer in one
Protects against corrosion
1Gal Coating
Roller Frame
2 Roller Colors
Scuff Pad
Paint Brush
Roller Pan
Practical Coverage at Recommended DFT (Assumes 15% Material Loss): 140-160 sq ft/gal
Dry Times at 77°F (25°C) and 50% Relative Humidity - Touch: 2 hours
Dry Times at 77°F (25°C) and 50% Relative Humidity - Handle: 24-48 hours
Dry Times at 77°F (25°C) and 50% Relative Humidity - Recoat: 3 hours
Dry Times at 77°F (25°C) and 50% Relative Humidity - Full Cure: 5 days
Technical Specifications
| Item#: | 1710722 |
|---|---|
| Manufacturer Model #: | 382628 |
| Type | Truck Bed Coating Kit |
| Size | 1 gal |
| Container Type | Kit |
| Color | Black |
| Physical Form | Liquid |
| Dry Time (To Touch) | 2 h |
| UNSPSC #: | 47131817 |
| TAA Compliant: | Yes |
Product Resources
View additional documents HERE . Additional languages available.
Product Restrictions
California Proposition 65: WARNING: Cancer and Reproductive Harm -
www.P65Warnings.ca.gov
